Saugus River and Tributaries Flood Damage Reduction Study: Lynn, Malden, Revere and Saugus, Massachusetts. Volume 7. Appendix J. Feasibility Study and EIS/EIR Comments and Responses. Section C. Final Report Review,
Abstract
This report summarizes flooding problems in the study area and alternative solutions; describes the selected plan and implementation responsibilities of the selected plan; and identifies environmental resources in the study area and potential environmental impact of alternative solutions. Included are descriptions of the tidal hydrology and hydrology of interior runoff in the study area, and of wave run up and seawall overtopping, interior flood stage frequencies, tide levels, flushing, currents, water quality conditions in the estuary and detailed project costs.
Document Details
- Document Type
- Technical Report
- Publication Date
- Apr 01, 1990
- Accession Number
- ADA235142
Entities
People
- Robert F Hunt
Organizations
- New England District, U.S. Army Corps of Engineers