Technology Insertion-Engineering Services Process Characterization, Task Order Number 1. Volume 5. Revision A
Abstract
During the 4th quarter of FY89, the contractor (MDMSC), completed process characterization of seven Resource Control Centers (RCCs). The purpose of this process characterization was to accomplish an engineering assessment and determine an As-Is baseline description of RCC operations, from which improvements could be measured. The data gathered during the process was used to drive a stochastic simulation model of the RCC, using the UDOS 2.0 model developed for this contract. Three of the RCCs characterized are in the Technology Repair Division (MAT) and four are in the Aircraft Division (MAB). The process characterization was performed as a part of the Technology Insertion-Engineering Services (TI-ES) program and was completed in three separate activity blocks as part of Task Order no. 1: Block 1 -- MATPGB, MATPSI, MATPSS, Block 2, MABPSA, MABPSB, MABPSP, and Block 3 MABPSC. This contract summary report addresses the seven RCCs characterized in Task Order no. 1 of the TI-ES contract, describes processes observed during data collection, and discusses results of experimentation with the UDOS 2.0 simulation model. This Technology Insertion (TI)/Industrial Process Improvement (IPI) summary report for SA-ALC contains focus study and quick fix recommendations for 7 RCC's. These RCC's are: MABPSA, MABPSB, MABPSP, MATPGB, MATPSI, and MATPSS.
Document Details
- Document Type
- Technical Report
- Publication Date
- Dec 22, 1989
- Accession Number
- ADA237165