E/O SYS5 Field Unit 9: Camera, Hardware Implementation and Development CFLOS Prediction Techniques.

Abstract

The contract task under this Line Item was to provide one E/O Camera, System 5, for installation as Field Unit No. 9, at sites to be mutually determined by the government and the Marine Physical Laboratory. Configuration modifications to enhance the system's mobility were to be implemented, and mobil deployment exercises were to be conducted.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
May 01, 1991
Accession Number
ADA239185

Entities

People

  • Richard W. Johnson

Organizations

  • Scripps Institution of Oceanography

Tags

DTIC Thesaurus Topics

  • Abstracts
  • Acquisition
  • Assembly
  • Classification
  • Contracts
  • Control Systems
  • Data Analysis
  • Deployment
  • Field Tests
  • Governments
  • Heavy Duty
  • Military Research
  • Mobility
  • Procurement
  • Security
  • Temperature Control

Readers

  • Atmospheric Remote Sensing.
  • Software Engineering
  • Unmanned Aerial System (UAS) Autonomous Capabilities and Mission Reconnaissance.