Comprehensive Base Realignment/Closure and Fort Belvoir Development
Abstract
This document presents the environmental impact resulting from the closure of Cameron Station, Virginia and associated realignments to Fort Belvoir, Fort Meyer, and Fort McNair. This document also addresses the realignments from Fort Meade, Fort Holabird, Army Material Testing Laboratory (AMTL), and leased space to Fort Belvoir. The effects on Fort Belvoir of the realignment of the Information Systems Command (ISC) to Fort Devens are also included in this document. The realignments involve the transfer of personnel, positions, and equipment among installations. In addition to the realignment of personnel and positions, Base Realignment and Closure (BRAC) requires the renovation of existing facilities and the construction of new facilities at Fort Belvoir and Fort Myer. Ten construction projects are planned at Fort Belvoir and four are planned at Fort Myer to accommodate the BRAC activities. Studies have been initiated to define the extent of any environmental contamination at Cameron Station. These studies will help in adequately assessing the health and environmental risks associated with closure; in determining the necessity for remedial action; and in developing and evaluating the remedial alternatives necessary to prepare the property for release.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jun 01, 1991
- Accession Number
- ADA239366
Entities
Organizations
- United States Army Corps of Engineers