Layaway Procedures for U.S. Army Facilities, Volume 1. Decision Criteria and Economics.
Abstract
This report describes facility layaway procedures for U.S. Army facilities, with an emphasis on Fort Dix, NJ. It focuses on decision criteria and the economics of facility layaway. Decision matrices for choosing cost- effective layaway strategies are presented. The concepts behind differing maintenance and repair (M and R) standards are addressed. Strategies for both short- and long-term layaway periods are described. The influence of the allowed reactivation period on M and R strategies is also described. Deactivation, periodic M and R, and reactivation for buildings and utilities are discussed, as are environmental and security concerns. The report concludes that facility layaway is technically feasible at an affordable cost.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jul 01, 1991
- Accession Number
- ADA240054
Entities
People
- D. M. Bailey
- D. R. Uzarski
- R. E. Rundus
- R. W. Harris
- S. D. Foltz
Organizations
- Construction Engineering Research Laboratory