Operation and Funding of the Regional Wartime Construction Manager

Abstract

This thesis prepares a training exercise scenario for the navy's regional wartime construction manager - mediterranean (RWCM). The RWCM is a reserve organization which has the responsibility for wartime or contingency construction management. To aid in the training exercise of the management of resources, a resource cost model is developed. First, a context for the use of the model is provided by examining the two funds used in contingency construction; operations and maintenance (O & M) and military construction (Milcon). Next, the policies of titles 10 and 41 of the U.S. code, which permit the use of unobligated milcon funds and deficiency spending, are discussed. Finally, the direct labor and over-head costs of the RWCM staff, the deputy, and the area managers are estimated.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Dec 01, 1990
Accession Number
ADA241665

Entities

People

  • Paul S. Cook

Organizations

  • Naval Postgraduate School

Tags

Communities of Interest

  • Biomedical
  • Energy and Power Technologies
  • Ground and Sea Platforms
  • Human Systems

DTIC Thesaurus Topics

  • Air Force
  • Civil Engineering
  • Construction
  • Cost Models
  • Engineering
  • Engineers
  • Landing Pads
  • Maintenance
  • Management Personnel
  • Organizational Structure
  • Personnel Management
  • Security
  • Training
  • Transportation
  • United States
  • United States European Command
  • Warfare

Readers

  • Defense Acquisition Program Management
  • Military History / Militaries and War Studies
  • Public Financial Management and Budgeting