B-2 Program: Trends in Manufacturing

Abstract

During the past several years, GAO has issued a series of reports on the B-2 stealth bomber program identifying causes of instability in the program, including manufacturing problems being encountered by the contractors. The objectives of this review were to determine the B-2 bomber's recent manufacturing progress and evaluate whether estimates to produce aircraft at planned production rates can be met. To meet the GAO objectives, GAO evaluated selected manufacturing indicators, including labor efficiency rates, manufacturing defects, changes to engineering drawings, work transferred to final assembly, and programs for production management. The B-2 aircraft combines conventional and state-of-the-art aircraft technology, such as special shaping and radar absorbing materials, and is designed to precise specifications needed to meet stealth requirements.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jul 01, 1991
Accession Number
ADA242141

Entities

Organizations

  • United States Government Accountability Office

Tags

DTIC Thesaurus Topics

  • Air Force
  • Aircraft Industry
  • Aircrafts
  • Contractors
  • Contracts
  • Cost Estimates
  • Department Of Defense
  • Engineering
  • Engineering Drawings
  • Fabrication
  • Manufacturing
  • Materials
  • Operations Management
  • Production
  • Production Rate
  • Test And Evaluation
  • Work Measurement

Fields of Study

  • Business

Readers

  • Defense Acquisition Program Management
  • Nanocomposite Materials Science
  • Software Engineering