Technical Support Task Report for the Modernization of Defense Logistics Standard Systems. Volume 2. Logistics Gateway Node Prototype Construction and Operation
Abstract
This technical report, in three volumes, in the final report covering more than 2 years of technical activity supporting the Modernization of Defense Logistics Standard Systems (MODELS) project. The supporting activities included developing translation tables and the table-driven software for converting current fixed-length logistics data formats into new variable-length transaction equivalents. They also included designing and testing prototype hardware platforms that support transaction interchange between logistics sites. This volume, Logistics Gateway Node Prototype Construction and Operation, is Volume II of the series. It details the construction and operation of the prototype logistics gateway nodes (LGNs) developed for the support task. The document is written from the perspective of software performance. it is provided to assist in understanding and implementing the technical specification developed for the LGN.
Document Details
- Document Type
- Technical Report
- Publication Date
- Apr 01, 1991
- Accession Number
- ADA243020
Entities
People
- Christo G. Andonyadis
- John Lycas
- John S. Doby
- William T. James Iii
Organizations
- LMI