Construction Foundation Report. Mud Mountain Dam Seepage Control Cutoff Wall, White River, Washington. Appendix.
Abstract
This appendix contains data from sampling and tests on the following: (1) Access shaft (Core) soil testing data; (2) Access shaft daily logs; (3) Bentonite slurry tests; (4) Hydrofraise productivity data; (5) Cutoff wall concrete aggregate gradations; (6) Cutoff wall concrete data; (7) Exploratory drilling logs and pressure tests; and (8) Dam (Raising) embankment materials data.
Document Details
- Document Type
- Technical Report
- Publication Date
- Aug 01, 1991
- Accession Number
- ADA244924
Entities
Organizations
- United States Army Corps of Engineers