Follow-On Site Investigation at the Manitowoc Army Reserve Center (MARC). Addendum. Sampling Design Plan

Abstract

This addendum to the Sampling Design Plan has been prepared by OHM remediation Services Corp. (OHM), a wholly owned subsidiary of OHM Corporation, to support Task Order No. 003 of Contract No. DAAA15-90-D-0019 for the requirement entitled Follow-on Site Investigation at the Manitowoc Army Reserve Center (MARC). The Sampling Design Plan (Data Item A004), June 1990, was prepared by E. C. Jordan Co., (Jordan) for the Site Investigation (SI) at MARC. The Jordan SI report was completed in August 1990. This addendum to the Sampling Design Plan describes the rationale and technical specifications for the required testing, sampling, analyses, and quality control (QC) procedures for the Follow-On Site Investigation (FSI). This addendum to the Sampling Design Plan is supported in part by the Sampling Design Plan (Data Item A004); the Quality Control Plan (Data Item A006), June 1990; and the Accident Prevention and Safety Plan (APSP) (Data Item A009), June 1990).

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jun 20, 1991
Accession Number
ADA248664

Tags

Communities of Interest

  • Biomedical
  • Engineered Resilient Systems

DTIC Thesaurus Topics

  • Alkenes
  • Aluminum Foil
  • Chemical Analysis
  • Chlorides
  • Containers
  • Contamination
  • Contractors
  • Contracts
  • Environmental Pollutants
  • Groundwater
  • Materials
  • Measurement
  • Natural Resources
  • Quality Control
  • Standards
  • Volatile Organic Compounds
  • Water Resources

Readers

  • Groundwater Contamination Remediation.
  • Software Engineering
  • Technical Research and Report Writing.