M198 Towed Howitzer Product Improvement Program (PIP) Overview
Abstract
An M198 Fielded System Review was completed September 1984. This review constituted a baseline for the development of the M198 Product Improvement Program (PIP). The areas being revised were a result of user concerns. Approval for the production and incorporation of the M198 PIP was granted by the AMCCOM Configuration Control Board on 8 September 1988. Fielding of the first production PIP kits are to begin August 1991. The purpose of the project is to provide an overview of the improvements being incorporated on the M198 Howitzers and the rationale for the selection of those solutions.
Document Details
- Document Type
- Technical Report
- Publication Date
- Apr 01, 1992
- Accession Number
- ADA249392
Entities
People
- Charles Widmer
- Gary Paulter
- Joseph Sankner
- Kenneth Heider
- Lisa Weland
- Wesley Rose
Organizations
- United States Army Armament Research, Development and Engineering Center