Integrated Information Support System (IISS). Volume 4. IISS System. Part 3. System Test Plan
Abstract
This plan defines the requirements, procedures, environments, and time control schedules that will be used to integrate and build, test, validate, release and support the Integrated Information Support System (IISS) for release 3.0 scheduled for September 30, 1990. The following tasks are required to meet these objectives: (1) Test preparation; (2) Configuration management; (3) Integration and build; (4) System installation and testing; (5) Release; and (6) Support.
Document Details
- Document Type
- Technical Report
- Publication Date
- Sep 30, 1990
- Accession Number
- ADA250124
Entities
People
- M. N. Foster
Organizations
- Control Data Corporation