Integrated Information Support System (IISS). Volume 4. IISS System. Part 3. System Test Plan

Abstract

This plan defines the requirements, procedures, environments, and time control schedules that will be used to integrate and build, test, validate, release and support the Integrated Information Support System (IISS) for release 3.0 scheduled for September 30, 1990. The following tasks are required to meet these objectives: (1) Test preparation; (2) Configuration management; (3) Integration and build; (4) System installation and testing; (5) Release; and (6) Support.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Sep 30, 1990
Accession Number
ADA250124

Entities

People

  • M. N. Foster

Organizations

  • Control Data Corporation

Tags

Communities of Interest

  • Human Systems

DTIC Thesaurus Topics

  • Air Force
  • Air Force Facilities
  • Classification
  • Computer Programs
  • Configuration Management
  • Contractors
  • Contracts
  • Corporations
  • Governments
  • Instructions
  • Language
  • Personnel Management
  • Security
  • Software Development
  • Standards
  • Test Beds
  • Translators

Fields of Study

  • Computer science

Readers

  • Database Systems and Applications
  • Software Engineering