Integrated Information Support System (IISS). Volume 4. IISS System. Part 5. System Test Plan
Abstract
This report is a summary of the successful IISS Release 3.0 integration and test activity that began August 1990, and completed November 1990. The activity included code check-in, build, system and installation testing, documentation review, update, verification, and release processing. Integration and test (I and T) was performed on the IISS test bed. The system test configuration comprised the VAX/VMS. The database systems included Oracle and VAX DBMS. The System Test Plan was used as a baseline control document throughout the integration and test activity. Code stability and the integration process was controlled using the IISS Configuration Management System on the VAX/VMS. Two types of system level tests were performed on the object code: regression and installation.
Document Details
- Document Type
- Technical Report
- Publication Date
- Sep 30, 1990
- Accession Number
- ADA250126
Entities
People
- M. Foster
Organizations
- Control Data Corporation