Integrated Information Support System (IISS). Volume 4. IISS System. Part 5. System Test Plan

Abstract

This report is a summary of the successful IISS Release 3.0 integration and test activity that began August 1990, and completed November 1990. The activity included code check-in, build, system and installation testing, documentation review, update, verification, and release processing. Integration and test (I and T) was performed on the IISS test bed. The system test configuration comprised the VAX/VMS. The database systems included Oracle and VAX DBMS. The System Test Plan was used as a baseline control document throughout the integration and test activity. Code stability and the integration process was controlled using the IISS Configuration Management System on the VAX/VMS. Two types of system level tests were performed on the object code: regression and installation.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Sep 30, 1990
Accession Number
ADA250126

Entities

People

  • M. Foster

Organizations

  • Control Data Corporation

Tags

Communities of Interest

  • Materials and Manufacturing Processes

DTIC Thesaurus Topics

  • Air Force
  • Air Force Facilities
  • Classification
  • Configuration Management
  • Contractors
  • Contracts
  • Corporations
  • Database Management Systems
  • Databases
  • Government Procurement
  • Governments
  • Manufacturing
  • Object Code
  • Power Supplies
  • Security
  • Technology Transfer
  • Test Beds

Fields of Study

  • Computer science

Readers

  • Database Systems and Applications
  • Software Engineering