Asbestos Survey for Fort Point U.S. Coast Guard Station. Volume 1. The Presidio of San Francisco. Phase 2 Environmental Study
Abstract
R.L. Stollar and Associates conducted an asbestos survey in all the buildings associated with the former U.S. Coast Guard Station at Fort Point on the Presidio of San Francisco. The intent of the survey was to identify the location and condition of all asbestos containing material and recommend asbestos abatement measures for any asbestos containing material which is in deteriorated condition. The report recommended remedial action in the duct work in Building 992 of the station.
Document Details
- Document Type
- Technical Report
- Publication Date
- Sep 01, 1991
- Accession Number
- ADA252910