Full-Scale Incineration System Trial Burns at the Naval Battalion Construction Center, Gulfport, Mississippi. Volume 2, Part 1
Abstract
Although six tests were planned, only three were actually completed. Weather and sampling problems forced the cancellation of the other three tests. This report describes the equipment and procedures used to conduct the tests, in addition to the detailed results of the trial burn. The rationable for the various technical and managerial decisions is given. The information contained in this volume describes the events, the planning efforts, and the data results of a trial burn conducted on a 100 ton/day mobile incinerator that was used to process soil contaminated with constituents of herbicide orange.