Full-Scale Incineration System Demonstration at the Naval Battalion Construction Center, Gulfport, Mississippi. Volume 4. Incinerator Operations
Abstract
The overall goal of the project was to determine the cost and effectiveness of a 100 ton/day rotary kiln incinerator in processing soil contaminated with dioxins and other hazardous constituents of Herbicide Orange. This report includes a general background section, a brief description of the process equipment, an operations planning and implementation section, a field operations section that includes a detailed description of the process equipment, an analytical procedure and results section that describes the methods and protocols as well as the ash sample analysis and publicly owned treatment works water analysis, and finally a conclusion and recommendations section.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jul 01, 1991
- Accession Number
- ADA252964
Entities
People
- J. A. Cook