Full-Scale Incineration System Demonstration at the Naval Battalion Construction Center, Gulfport, Mississippi. Volume 5. Incinerator Availability

Abstract

The overall goal of the project was to determine the cost and effectiveness of a 100 tons/day rotary kiln incinerator in processing soil contaminated with dioxins and other hazardous constituents of Herbicide Orange. This report includes a general background section, a brief description of the MWP-2000 incinerator system components and operation, the planning and implementation used to collect availability data, field operations and field data, the incinerator availability evaluation, and finally a conclusion and recommendation section.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jul 01, 1991
Accession Number
ADA252965

Entities

People

  • J. A. Cook

Tags

Communities of Interest

  • Biomedical
  • Human Systems

DTIC Thesaurus Topics

  • Acquisition
  • Air Force
  • Air Force Facilities
  • Air Pollution
  • Bricks
  • Combustion
  • Computers
  • Construction
  • Data Acquisition
  • Databases
  • Engineering
  • Failure Mode And Effect Analysis
  • Maintenance
  • Reliability
  • Test And Evaluation
  • Test Equipment
  • United States

Readers

  • Environmental Engineering.
  • Systems Analysis and Design