Reconnaissance Report, Section 205 Chattooga River Trion, Georgia, Chattooga County
Abstract
The purpose of this study was to determine if planning should proceed to feasibility. The conclusion of the report indicates that raising the height of the existing levee built by the SCS in 1980, along with channel clearing, is an economically feasible plan. While we don't at this time have a sponsor, we are working toward a joint effort with the SCS to perform additional studies and construction of a project. This would be accomplished at 100 percent Federal cost.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jul 01, 1991
- Accession Number
- ADA257708
Entities
People
- Cecil Jernigan
- Jack Cunningham
- Robert Allen
- Robert Murray
Organizations
- Mobile District, U.S. Army Corps of Engineers