Reconnaissance Report, Section 205 Chattooga River Trion, Georgia, Chattooga County

Abstract

The purpose of this study was to determine if planning should proceed to feasibility. The conclusion of the report indicates that raising the height of the existing levee built by the SCS in 1980, along with channel clearing, is an economically feasible plan. While we don't at this time have a sponsor, we are working toward a joint effort with the SCS to perform additional studies and construction of a project. This would be accomplished at 100 percent Federal cost.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jul 01, 1991
Accession Number
ADA257708

Entities

People

  • Cecil Jernigan
  • Jack Cunningham
  • Robert Allen
  • Robert Murray

Organizations

  • Mobile District, U.S. Army Corps of Engineers

Tags

Communities of Interest

  • Air Platforms
  • Ground and Sea Platforms
  • Human Systems

DTIC Thesaurus Topics

  • Commerce
  • Construction
  • Cost Estimates
  • Economic Analysis
  • Embankments
  • Employment
  • Engineering
  • Engineers
  • Environment
  • Excavation
  • Failure Mode And Effect Analysis
  • Flood Control
  • Floods
  • Geotechnical Engineering
  • Petroleum
  • Transportation
  • Water Resources

Readers

  • Environmental Impact Assessment (EIA) of Proposed Air Force Base Actions.
  • Life Cycle Cost Analysis
  • Riverine Ecology