Upgrade Precision Runway Monitor (PRM) Operational Test And Evaluation (OT and E) Test Plan

Abstract

This document defines the Upgrade Precision Runway Monitor (Upgrade PRM) Operational and Integration tests that will be conducted at the Federal Aviation Administration (FAA) Operational facilities. These tests will be executed at Raleigh-Durham Airport (RDU) following the Contractor Site Acceptance Test. The Upgrade PRM test configuration is addressed in conjunction with the associated interfaces which will be required to perform the testing in as near an operational environment as possible. The Air Traffic (AT) Operational requirements and test objectives are contained in this test plan. In addition to providing requirements traceability, this plan contains a description of the tests which will be executed, associated success criteria, roles and responsibilities of test personnel, and the overall flow of activities required for a successful test program.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Oct 01, 1992
Accession Number
ADA257892

Entities

People

  • Charles Dudas
  • Jeffrey Livings
  • Ricardo Astillero
  • Thomas Bratton

Organizations

  • Federal Aviation Administration

Tags

Communities of Interest

  • Air Platforms
  • Human Systems
  • Weapons Technologies

DTIC Thesaurus Topics

  • Acceptance Tests
  • Air Traffic
  • Air Traffic Controllers
  • Airport Radar Systems
  • Airports
  • Contractors
  • Contracts
  • Data Analysis
  • International Airports
  • Personnel Management
  • Radar
  • Reliability
  • Simulations
  • Simulators
  • Software Testing
  • Test And Evaluation
  • Test Management

Readers

  • Aviation Safety and Air Traffic Management
  • Civilian Systems Systems Program Capability Development and Upgrade Support Activity Expense and Pay Management.
  • Software Engineering.