Terminal Doppler Weather Radar (TDWR) Operational Test and Evaluation (OT and E) Integration Test Plan

Abstract

The Terminal Doppler Weather Radar (TDWR) Operational Test and Evaluation (OT and E) Integration Test Plan provides the overall philosophy and approach to -the TDWR OT and E Integration portion of Technical Field Test and Evaluation (TFT and E) to be conducted at the Federal Aviation Administration Aeronautical Center (FAAAC) in Oklahoma City, OK. This plan identifies the necessary support that is required to accomplish OT and E Integration; test roles and responsibilities of personnel, training requirements, and overall schedule of activities. This plan identifies the National AIrspace System (NAS) operational and integration requirements of the TDWR. These requirements are contained in a Test Verification Requirements Traceability Matrix (TVRTM).

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Nov 01, 1992
Accession Number
ADA259253

Entities

People

  • Eric Hess

Organizations

  • Federal Aviation Administration

Tags

Communities of Interest

  • Human Systems

DTIC Thesaurus Topics

  • Accuracy
  • Air Traffic
  • Air Traffic Controllers
  • Computers
  • Data Analysis
  • Detection
  • Engineering
  • Field Tests
  • Hard Copy
  • Materials
  • Meteorological Radar
  • Personnel Management
  • Software Testing
  • Systems Engineering
  • Test And Evaluation
  • Test Equipment
  • Test Management

Readers

  • Aerospace Test and Evaluation
  • Atmospheric Science/Meteorology

Technology Areas

  • Space