Limited Production Precision Runway Monitor (PRM) Master Test Plan
Abstract
This Master Test Plan (MTP) establishes the basic framework to guide and direct the Limited Production (LP) Precision Runway Monitor (PRM) test program. This MTP explains the relationship between all test phases. It concerns the LP PRM system's readiness to be integrated into the National Airspace System (NAS). Sufficient detail is provided to define and direct the development of the next lower level of documentation. The MTP addresses the responsibilities of the LP PRM contractor and the Federal Aviation Administration (FAA).... Limited Production (LP), Precision Runway Monitor (PRM), Master test plan.
Document Details
- Document Type
- Technical Report
- Publication Date
- Nov 01, 1992
- Accession Number
- ADA259310
Entities
People
- Thomas Bratton
Organizations
- Federal Aviation Administration