Review of Factors Impacting Warranty Cost-Benefit Analysis for the Sensor Fuzed Weapon System

Abstract

The purpose of this research effort was to identify factor that affect the warranty cost-benefit analysis for the Sensor Fuzed Weapon (SFW) system since an essential performance requirement (EPR) warranty waiver was under consideration. Defense funding has become scarce, and the limited dollars must be spent wisely. A cost-benefit analysis should provide a relevant projection of cost-effectiveness based on the best available data. The SFW and other dormant weapon systems present difficulties in determining cost- effectiveness because the systems most probably will be non-operating, non- reusable, and non-restorable. Three recommendations were made, relevant to dormant weapon systems, that pertained to further cost analysis and review of overall warranty effectiveness. The SFW's EPR warranty will become effective in 1996. In the meantime. the program manager can examine more closely the feasibility of the EPR warranty and the warranty in total.... Cost Effectiveness, Cost Analysis, Guarantees, Bombs.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Sep 01, 1992
Accession Number
ADA259446

Entities

People

  • Donna E. Kehrt

Organizations

  • Air Force Institute of Technology

Tags

Communities of Interest

  • Ground and Sea Platforms
  • Weapons Technologies

DTIC Thesaurus Topics

  • Acquisition
  • Contractors
  • Contracts
  • Cost Analysis
  • Cost Benefit Analysis
  • Cost Effectiveness
  • Department Of Defense
  • Government Procurement
  • Governments
  • Logistics
  • Maintenance
  • Munitions
  • Procurement
  • Propulsion Systems
  • Reliability
  • Test And Evaluation
  • United States

Readers

  • Government Contracting/Procurement.
  • Instructional Design and Training Evaluation.
  • Munitions and Ordnance Engineering