Structured Analysis for the Logistic Support Analysis (LSA) Task and the Integrated Logistic Support (ILS) Element: Structured Analysis, ILS Review Element E15, Cost Analysis and Funding

Abstract

This report is one of a series presenting the Structured Analysis for the Logistic Support Analysis (LSA) Task and the Integrated Logistic Support (ILS) Element. Included in this report is the System Analysis for the LSA Task and the ILS Element E15, Cost Analysis and Funding , with the corresponding description of the processes, data flows, data stores, and external entities involved on each DFD. An overview of the Cost Analysis and Funding review process, as well as a brief working description of the Structured Systems Analysis Fundamentals.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jun 01, 1989
Accession Number
ADA259637

Entities

People

  • Ronald Duclos

Tags

Communities of Interest

  • Human Systems

DTIC Thesaurus Topics

  • Computer Programming
  • Computer Programs
  • Contractors
  • Contracts
  • Cost Analysis
  • Cost Estimates
  • Costs
  • Governments
  • Life Cycles
  • Logistics
  • Maintenance
  • Personnel Management
  • Standards
  • Systems Analysis
  • Systems Engineering
  • Test And Evaluation
  • Test Equipment

Fields of Study

  • Engineering

Readers

  • Business Analytics
  • Logistics and Supply Chain Management.