OETC Optical Backplane Bus Testbed. IBM Tasks: Receiver OEIC and Link Simulation Tools and Analysis
Abstract
The general objective of this first contract period was to establish people interactions between researchers at the OETC companies, and establish a methodology for co-ordinating the development of the components in the Testbed. Specifically, we were to: (1) Establish contacts between researchers/engineers from each company; (2) Define a framework for interfaces specifications between components; (3) Obtain preliminary component specifications; (4) Identify experiments needed or test vehicles needed to determine initial specifications; and (5) Establish reporting and interaction procedures within IBM. The main challenge to setting up this framework is getting the right people interacting and understanding the main features and limitations of each component.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jan 01, 1992
- Accession Number
- ADA263854
Entities
People
- Dennis Rogers
- John Crow
- Richard Bates
- Young Kwark
Organizations
- International Business Machines Corporation (Armonk, NY)