OETC Optical Backplane Bus Testbed. IBM Tasks: Receiver OEIC and Link Simulation Tools and Analysis

Abstract

The general objective of this first contract period was to establish people interactions between researchers at the OETC companies, and establish a methodology for co-ordinating the development of the components in the Testbed. Specifically, we were to: (1) Establish contacts between researchers/engineers from each company; (2) Define a framework for interfaces specifications between components; (3) Obtain preliminary component specifications; (4) Identify experiments needed or test vehicles needed to determine initial specifications; and (5) Establish reporting and interaction procedures within IBM. The main challenge to setting up this framework is getting the right people interacting and understanding the main features and limitations of each component.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jan 01, 1992
Accession Number
ADA263854

Entities

People

  • Dennis Rogers
  • John Crow
  • Richard Bates
  • Young Kwark

Organizations

  • International Business Machines Corporation (Armonk, NY)

Tags

Communities of Interest

  • Advanced Electronics
  • Energy and Power Technologies

DTIC Thesaurus Topics

  • Amplifiers
  • Birds
  • Communication Systems
  • Contracts
  • Couplings
  • Detectors
  • Engineering
  • Fabrication
  • Frequency
  • Operating Systems
  • Power Supplies
  • Simulations
  • Simulators
  • Spreadsheet Software
  • Standards
  • Test Equipment
  • Test Vehicles

Readers

  • Integrated Circuit Design and Technology.
  • Software Engineering
  • Systems Analysis and Design