A Survey-Level Report of the Birds Point-New Madrid Floodway Riverside Access Lanes, Near the Tom Bird Blue Hole and Outlet Crevasse 2, New Madrid and Mississippi Counties, Missouri

Abstract

Intensive cultural resources surveys were conducted over approximately 3 acres. A records and literature search indicated one site (23NM234) near the outlet crevasse location. This site is riverside of the levee near an access lane, but not in the project right-of-way. Also, two sites(UR1 and 23MI136) are adjacent to Tom Bird Blue Hole but are landside of the levee thus not in the project right-of-way.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jul 01, 1985
Accession Number
ADA264680

Entities

People

  • Jimmy D. Mcneil

Organizations

  • Memphis District, U.S. Army Corps of Engineers

Tags

Communities of Interest

  • Counter IED

DTIC Thesaurus Topics

  • Anthropology
  • Archeology
  • Army
  • Army Corps Of Engineers
  • Birds
  • Cultural Resources
  • Engineers
  • Geography
  • Historic Preservation
  • Lepidoptera
  • Literature
  • Mississippi
  • Mississippi River
  • Missouri
  • Ridges
  • United States
  • Vegetation

Readers

  • Archaeological Resource Survey