Demonstration Erosion Control Project Monitoring Program, Fiscal Year 1992 Report. Volume 3. Appendix B. Long Creek Watershed Profiles and Cross Sections

Abstract

The purpose of monitoring the Demonstration Erosion Control (DEC) project is to evaluate and document watershed response to the implemented DEC project. Documentation of watershed responses to DEC Project features will allow the participating agencies a unique opportunity to determine the effectiveness of existing design guidance for erosion and flood control in small watersheds. The monitoring program includes 11 technical areas: stream gaging, data collection and data management, hydraulic performance of structures, channel response, hydrology, upland watersheds, reservoir sedimentation, environmental aspects, bank stability, design tools, and technology transfer. Appendix B documents the channel cross-section and profile data used in the detailed geomorphic assessment for the Long Creek watershed that is presented in Volume I of this report. Channel cross sections, Channel profiles, Long Creek

Open PDF

Document Details

Document Type
Technical Report
Publication Date
May 01, 1993
Accession Number
ADA267554

Entities

People

  • Lisa C. Hubbard
  • Terry N. Waller

Tags

DTIC Thesaurus Topics

  • Abstracts
  • Army
  • Army Corps Of Engineers
  • Buildings And Structures
  • Data Management
  • Data Science
  • Demonstrations
  • Drainage Basins
  • Engineering
  • Engineers
  • Flood Control
  • Geographic Regions
  • Information Operations
  • Monitoring
  • Plastic Explosives
  • Technology Transfer
  • United States

Readers

  • Coastal and Marine Engineering/Sediment Transport/Hydraulic Engineering