Demonstration Erosion Control Project Monitoring Program
Abstract
The purpose of monitoring the Demonstration Erosion Control (DEC) project is to evaluate and document watershed response to the implemented DEC project. Documentation of watershed responses to DEC Project features will allow the participating agencies a unique opportunity to determine the effectiveness of existing design guidance for erosion and flood control in small watersheds. The monitoring program includes 11 technical areas: ream gaging, data collection and data management, hydraulic performance of structures, channel response, hydrology, upland watersheds, reservoir sedimentation, environmental aspects, bank stability, design tools, and technology transfer. Appendix C documents the channel cross-section and profile data used in the detailed geomorphic assessment for the Batupan Bogue watershed that is presented in Volume I of this report.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jun 01, 1993
- Accession Number
- ADA267830
Entities
People
- Lisa C. Hubbard
- Terry N. Waller
Organizations
- Vicksburg District, U.S. Army Corps of Engineers