Sanitary Sewer Master Plan and Preliminary Drainage Study for the South Cheyenne Water and Sewer District

Abstract

This planing study is prepared for the South Cheyenne Water and Sewer District, and gives the necessary planning tools to evaluate the current and future conditions of their sewer system. The major steps in this study are as follows: mapping the existing sewer system; evaluating the theoretical capacity of existing collection lines; predicting the existing and the future sewage loads in these collection lines; recommending improvements to the existing system; recommending the improvements that will be necessary to handle future development, and providing the District with a method of recording future development and projecting overloads in order to provide the appropriate relief sewers as they are needed. Recommended relief sewers for existing and future populations are shown with the existing sewer system in the 7 maps at the end of this report

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Mar 29, 1985
Accession Number
ADA269179

Tags

Communities of Interest

  • Materials and Manufacturing Processes
  • Weapons Technologies

DTIC Thesaurus Topics

  • Accumulators
  • Boundaries
  • Coefficients
  • Drainage Basins
  • Engineering
  • Flow
  • Maintenance
  • Payload
  • Plastic Explosives
  • Potential Flow
  • Public Utilities
  • Rainfall Intensity
  • Standards
  • Surface Waters
  • United States
  • Water
  • Water Supplies

Readers

  • Environmental Engineering.
  • Life Cycle Cost Analysis
  • Systems Analysis and Design