Red River Depot Operations Center Design Simulation Analysis

Abstract

The Depot Operations Support Office (DOSO) designed the blueprints for a Depot Operations Center (DOC) to be built at DLA's Red River depot. The DOC will consolidate the currently dispersed areas of receiving, packaging and preservation, storage, and packing and shipping. This analysis evaluates DOSO's design for impediments and inefficiencies when subject to a simulated dynamic environment. Depot Operations, Consolidation, Design, Simulation analysis.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jul 01, 1993
Accession Number
ADA271133

Entities

People

  • Gary Yielding
  • Robert Greiner
  • Steve Uehling

Organizations

  • Defense Logistics Agency

Tags

Communities of Interest

  • Human Systems

DTIC Thesaurus Topics

  • Abstracts
  • Contracts
  • Conveyors
  • Data Analysis
  • Economic Analysis
  • Engineering
  • Environment
  • Materials
  • Packaging
  • Pallets
  • Shipping
  • Simulations
  • Standards
  • Storage
  • Time Standards
  • Transportation
  • Work Stations

Readers

  • Coastal Oceanography
  • Defense Acquisition Program Management
  • Logistics and Supply Chain Management.