Final Decision Document for the Interim Response Action for Building 1727 Sump at Rocky Mountain Arsenal

Abstract

This interim response action will consist of the treatment and disposal of wastewater from bld1727 sum to mitigate 1) Any future release of contaminated water and 2) The potential adverse affects associated with a release of contaminated water. In addition, this IRA will reduce the mobility, toxicity, and volume of contaminate water in the sump. This final decision document provides summaries of: 1. Alternatives considered 2. Significant events leading to the initiation of the IRA 3. The IRA project 4. The applicable or relevant and appropriate requirements, standards, criteria, or limitations (ARAR's) associated with the program. The preferred action is to pump and treat with existing activated alumina/granular activated carbon treatment system.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Dec 01, 1988
Accession Number
ADA271213

Tags

DTIC Thesaurus Topics

  • Birds
  • Contamination
  • Contractors
  • Drinking Water
  • Ecology
  • Emergency Response
  • Engineering
  • Environment
  • Environmental Pollutants
  • Environmental Protection
  • Groundwater
  • Hazardous Waste
  • Materials
  • United States
  • Waste Management
  • Water Quality
  • Wildlife

Fields of Study

  • Environmental science

Readers

  • Environmental Engineering.
  • Environmental Remediation and Restoration.