Final Decision Document for the Interim Response Action at the M-1 Settling Basins, Rocky Mountain Arsenal, Version 4.0
Abstract
The objective of the interim response action at the M-1 settling basins is to mitigate the threat of release of contaminants from the basins which are a direct source of as contamination to the ground water. The proposed IRA consists of (1) construction of a 360 degree subsurface barrier and (2) treatment of the wastes with in-situ vitrification. This decision document provides summaries of: (1) alternative technologies considered; (2) significant events leading to the initiation of the IRA; (3) the IRA project; and (4) applicable or relevant and appropriate requirements, standards, criteria, and limitations (ARAR's) associated with the program.