Final Alternatives Assessment of Interim Response Actions for Other Contamination Sources M-1 Settling Basins, Rocky Mountain Arsenal, Version 3.1

Abstract

This document describes the process and results of the alternatives assessment conducted for the M-1 settling basins. These three basins are located in the south plants area and are a direct source of a contamination to the ground water. The goal of this assessment is to evaluate alternatives based upon such factors as (1) the protection of human health and the environment, (2) mitigation of the threat to human health, and (3) cost. The assessment is divided into the following sections: (1) introduction; (2) site background and the results of current and previous investigations; (3) identification and evaluation of interim action technologies; (4) development and evaluation of alternatives; (5) cost estimates; and (6) conclusions. The preferred technologies are 1) in situ vitrification and 2) chemical.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Nov 01, 1989
Accession Number
ADA271372

Tags

Communities of Interest

  • Biomedical

DTIC Thesaurus Topics

  • Aluminum Oxides
  • Arsenates
  • Chemistry
  • Construction
  • Environment
  • Environmental Protection
  • Geology
  • Groundwater
  • Material Degradation Processes
  • Materials Laboratories
  • Materials Processing
  • Materials Science
  • Natural Resources
  • Oxidation
  • Waste Disposal Facilities
  • Waste Management
  • Water Resources

Readers

  • Business Analytics
  • Environmental Engineering.