Engineering Design, Construction, Operation, and Maintenance for the 7- Ohm Line and Relativistic Klystron Facilities
Abstract
SFA designed, built, installed, operated, and maintained special- purpose equipment and fixtures in support of experimental research in high-power RF radiation and particle acceleration. Specifically, SFA personnel designed and fabricated hardware for experimental application of the 7-Ohm line generator, modulated intense relativistic electron beams (IREBs); constructed magnetic field coils and low-voltage, high-energy capacitor banks; upgraded the relativistic klystron facility; and designed and fabricated a relativistic klystron amplifier.
Document Details
- Document Type
- Technical Report
- Publication Date
- Sep 01, 1993
- Accession Number
- ADA271641
Entities
People
- Mariano Sy
- Scott Smith