Hydrazine Blending and Storage Facility, Interim Response Action Implementation, Final Sampling Design Plan. Appendix A to Task Plan
Abstract
This document is submitted as Appendix A to the Task Plan of the Hydrazine Blending and Storage Facility (HBSF) Interim Response Action (IRA). This plan details procedures that will be followed in implementing the field phase of the program, including sampling locations and frequency, analytical parameters and methods, sample handling and collection procedures, and quality control samples. Procedures contained herein are consistent with those developed and implemented during previous field efforts at Rocky Mountain Arsenal (RMA). In certain instances, procedures are modified slightly from previous programs because of different program objectives or requirements
Document Details
- Document Type
- Technical Report
- Publication Date
- Aug 30, 1989
- Accession Number
- ADA272023