Rocky Mountain Arsenal North Boundary Containment/Treatment System Operational Assessment Report

Abstract

This report was prepared to document and assess the status and overall operational performance of the north boundary containment/treatment system. It covers the period October, 1987, through September, 1988. The objectives of the report include: (1) assess the continuing effectiveness of the north boundary system in preventing off-post migration of contaminated ground water; (2) document system operating parameters; (3) identify and document system improvements and facility alterations conducted during FY88. Appendices include: (1) plant flow data; (2) plant water quality data, (3) dewatering well data.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Dec 01, 1989
Accession Number
ADA272143

Entities

People

  • David Thompson
  • J. Dildine
  • N. Francingues

Tags

Communities of Interest

  • Biomedical

DTIC Thesaurus Topics

  • Alkenes
  • Carbon Tetrachloride
  • Chlorides
  • Colorado
  • Commerce
  • Control Systems
  • Dewatering
  • Engineers
  • Environmental Pollutants
  • Flow
  • Flow Rate
  • Groundwater
  • Monitoring
  • Mountains
  • Rocky Mountains
  • Water Flow
  • Water Quality

Readers

  • Business Analytics
  • Coastal and Marine Engineering/Sediment Transport/Hydraulic Engineering
  • Wetland-Land-Environmental Management.