Rocky Mountain Arsenal, Sections 26 and 25 Contamination Survey. Phase 1

Abstract

This final technical plan describes the work to be undertaken to provide technical services necessary to conduct a phase I survey of sections 26 and 35. The objective of task 6 is to obtain the semiquantitative chemical data from each site sufficient to allow determination of site geometry, contaminants present, and design of the phase II program. Sections of this report detail information on the following: field sampling, geophysical investigation, chemical analysis, and contamination assessment. Appendix a contains a letter technical plan for additional basin F sampling.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Dec 01, 1987
Accession Number
ADA272310

Tags

Communities of Interest

  • Biomedical

DTIC Thesaurus Topics

  • Chemical Analysis
  • Chemical Synthesis
  • Chemistry
  • Construction
  • Contamination
  • Coordinate Systems
  • Ecology
  • Environment
  • Environmental Pollutants
  • Environmental Protection
  • Groundwater
  • Health Services
  • Medical Personnel
  • Munitions Testing
  • Organic Compounds
  • Photographs
  • Waste Products

Readers

  • Environmental Remediation and Restoration.
  • Software Engineering