Final Implementation Document for the Interim Response Action for Building 1727 Sump at the Rocky Mountain Arsenal
Abstract
Presented in this report are the operation and maintenance procedures (Volume I) and the health and safety plan (Volume II). For the activated alumina/ granulated activated carbon wastewater treatment system that was installed adjacent to sump 1727 during October and November 1987. The system train consists of (1) an untreated wastewater holding tank, (2) a pH adjustment system, and (3) parallel AA/GAC treatment trains. The total system presently treats four to five gallons of water per minute. Information given in the report includes: 1. Water Standards 2. Treatment System Description 3. Treatment System Operation Procedures 4. Maintenance Procedures 5. Laboratory Analyses 6. Health and Safety Plan Specific to the Operation of the Sump.