Contamination Assessment Report, Site 1-7, Hydrazine Blending and Storage Facility. Version 3.2
Abstract
This final report documents the Phase I contamination survey of site 1-7, the hydrazine blending and storage facility constructed in 1960 for the Air Force. 54 samples from 15 borings were analyzed for volatile and semivolatile organics and metals with separate analyses for AS, HG, DBCP, hydrazines, and nitrosamines. MIBK, DLDRN, CD, CR, CU, PB, ZN, and AS were detected within or above their respective indicator ranges; However, the concentrations of CU, PB, ZN, and AS appeared to be naturally occurring levels. BTZ was also tentatively identified in 1 boring. A Phase II program consisting of 37 additional borings is recommended. The volume of potentially contaminated soil present is estimated at 190,000 cubic yards.
Document Details
- Document Type
- Technical Report
- Publication Date
- Sep 01, 1988
- Accession Number
- ADA272575
Entities
Organizations
- Ebasco Services