Contamination Assessment Report, Site 1-7, Hydrazine Blending and Storage Facility. Version 3.2

Abstract

This final report documents the Phase I contamination survey of site 1-7, the hydrazine blending and storage facility constructed in 1960 for the Air Force. 54 samples from 15 borings were analyzed for volatile and semivolatile organics and metals with separate analyses for AS, HG, DBCP, hydrazines, and nitrosamines. MIBK, DLDRN, CD, CR, CU, PB, ZN, and AS were detected within or above their respective indicator ranges; However, the concentrations of CU, PB, ZN, and AS appeared to be naturally occurring levels. BTZ was also tentatively identified in 1 boring. A Phase II program consisting of 37 additional borings is recommended. The volume of potentially contaminated soil present is estimated at 190,000 cubic yards.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Sep 01, 1988
Accession Number
ADA272575

Entities

Organizations

  • Ebasco Services

Tags

Communities of Interest

  • Biomedical
  • Weapons Technologies

DTIC Thesaurus Topics

  • Air Force
  • Alkanes
  • Alkenes
  • Chemical Warfare Agents
  • Construction
  • Control Systems
  • Detectors
  • Environment
  • Environmental Protection
  • Fire Control Systems
  • Groundwater
  • Hydrazines
  • Liquid Chromatography
  • Organic Compounds
  • Plastic Explosives
  • Warning Systems
  • Water Resources

Fields of Study

  • Environmental science

Readers

  • Analytical Chemistry
  • Environmental Remediation and Restoration.
  • Thin Film Deposition Science.