Final Decision Document for the Interim Response Action for the Improvement of the North Boundary System at Rocky Mountain Arsenal via Construction of Groundwater Recharge Trenches

Abstract

The Interim Response Action (IRA) for the Improvement of the North Boundary System at Rocky Mountain Arsenal (RMA) Via Construction Of Groundwater Recharge Trenches is being conducted as part of the IRA Process for RMA in accordance with the June 5, 1987 report to the court in United States v. Shell Oil Co. and the proposed Consent Decree

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jul 01, 1988
Accession Number
ADA273185

Tags

Communities of Interest

  • Biomedical

DTIC Thesaurus Topics

  • Air Pollution
  • Birds
  • Chemical Synthesis
  • Chemical Warfare
  • Chemical Warfare Agents
  • Construction
  • Contamination
  • Environmental Monitoring
  • Environmental Pollutants
  • Environmental Protection
  • Excavation
  • Groundwater
  • Materials
  • Measurement
  • Standards
  • United States
  • Waste Disposal Facilities

Readers

  • Environmental Remediation and Restoration.
  • Government and Public Administration Law.