Munitions Test Area and Incendiary Drop Site, Site 36-2, Data Addendum, Phase 2.

Abstract

As a result of the Phase I contamination assessment at Rocky Mountain Arsenal (RMA), a Phase II program was initiated at Site 36-2 in March, 1988. The Phase II program was conducted as presented in the Phase I Contamination Assessment Report (CAR), except that three borings were relocated

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Sep 01, 1988
Accession Number
ADA273347

Tags

Communities of Interest

  • C4I

DTIC Thesaurus Topics

  • Alkenes
  • Chemical Analysis
  • Chemical Warfare Agents
  • Chlorides
  • Chromatography
  • Detection
  • Detectors
  • Ecology
  • Engineering
  • Gas Chromatography
  • Mass Spectrometry
  • Monitoring
  • Munitions
  • Munitions Testing
  • Organic Compounds
  • Plastic Explosives
  • Rocky Mountains

Fields of Study

  • Environmental science

Readers

  • Archaeological Resource Survey
  • Environmental Engineering.