Implementation Document for Groundwater Intercept and Treatment System, Basin A Neck IRA. Volume 3: Engineering Drawings
Abstract
The Basin A Neck interim response action will consist of: 1. Seven dewatering wells; 2. Soil bentonite slurry wall; 3. Ground water treatment by activated carbon; and 4. Gravel-filled recharge trenches. Engineering drawings are found in Volume 3.
Document Details
- Document Type
- Technical Report
- Publication Date
- Aug 01, 1989
- Accession Number
- ADA273436