Implementation Document for Groundwater Intercept and Treatment System, Basin A Neck IRA. Volume 3: Engineering Drawings

Abstract

The Basin A Neck interim response action will consist of: 1. Seven dewatering wells; 2. Soil bentonite slurry wall; 3. Ground water treatment by activated carbon; and 4. Gravel-filled recharge trenches. Engineering drawings are found in Volume 3.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Aug 01, 1989
Accession Number
ADA273436

Tags

Communities of Interest

  • Air Platforms
  • Biomedical
  • Energy and Power Technologies
  • Human Systems

DTIC Thesaurus Topics

  • Birds
  • Colorado
  • Computing Devices
  • Concrete
  • Construction
  • Contractors
  • Control Panels
  • Engineering
  • Engineering Drawings
  • Engineers
  • Groundwater
  • Materials
  • Materials Science
  • Reinforced Concrete
  • Seals
  • Specifications
  • Stereolithography

Readers

  • Environmental Remediation and Restoration.
  • Geotechnical Engineering.