Rocky Mountain Arsenal, Sanitary Sewer Interim Response Action, Construction Documents for New Sanitary Sewer Construction. Volume 2

Abstract

The primary objective of this interim response action is to prevent the potential spread of contamination via the sanitary sewer system. The IRA will consist of (1) Construction of a new sanitary sewer, and (2) Sealing of the existing sewer in the north plants and south plants areas along with the interceptor line in section 36. Sections and appendices of this final implementation plan include: (1) Background and overview of course of action; (2) Procedures for sealing the existing sewer lines with concrete; (3) Schedule of closure events; (4) Health and safety plan for closure of existing lines; (5) Specifications and plans for the new sanitary sewer; (6) Chemical, physical, and biological properties of contaminants; and (7) Request for proposals.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
May 01, 1990
Accession Number
ADA273513

Entities

Organizations

  • Weston Solutions (United States)

Tags

Communities of Interest

  • Biomedical
  • Ground and Sea Platforms
  • Human Systems
  • Weapons Technologies

DTIC Thesaurus Topics

  • Alkenes
  • Chemistry
  • Construction
  • Construction Materials
  • Engineers
  • Groundwater
  • Health Services
  • Material Degradation Processes
  • Materials Laboratories
  • Materials Processing
  • Materials Science
  • Materials Testing
  • Medical Personnel
  • Precast Concrete
  • Prestressed Concrete
  • Reinforced Concrete
  • Test And Evaluation

Readers

  • Business Analytics
  • Environmental Engineering.
  • Software Engineering