Basewide Engineering Evaluation-Cost Analysis for Soil Vapor Extraction. Site Specific Document IC 1

Abstract

This document supports the use of soil vapor extraction (SVE) as the non-time-critical removal action for selected areas with high levels of volatile organic compound (VOC) contamination in Investigation Cluster 1 (IC 1), which is located near the center of Operable Unit B (OU B). This SVE removal action is part of the initial basewide SVE removal action at McClellan Air Force Base (McAFB). The principal objective of basewide SVE removal actions is to achieve early risk reduction by removing a significant quantity of VOCs from soils in the vadose zone, intercepting an exposure pathway, or preventing additional VOC flux to groundwater

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Nov 01, 1993
Accession Number
ADA273523

Tags

Communities of Interest

  • Air Platforms

DTIC Thesaurus Topics

  • Air Force
  • Alkenes
  • Chemistry
  • Chlorides
  • Cost Analysis
  • Cost Estimates
  • Detection
  • Engineering
  • Environmental Pollutants
  • Groundwater
  • Installation Restoration
  • Measurement
  • Organic Compounds
  • Risk Analysis
  • Three Dimensional
  • Volatile Organic Compounds
  • Waste Products

Fields of Study

  • Environmental science

Readers

  • Environmental Remediation and Restoration.