West Desert Pumping Project

Abstract

The purpose of this final environmental impact statement (EIS) is to supplement the draft EIS which was published February 10, 1986. Together, the draft and final EISs incorporate the analyses of the environmental consequences resulting from construction and operation of the West Desert Pumping Project or Diking to Protect Critical Facilities. Chapter 1 contains analyses of the changes that have occurred to the Great Salt Lake due to the very wet spring of 1986. Chapter 2 discusses impacts that would occur, or have changed substantially, due to the changes in the project. Chapter 3 is an Errata Summary that indicates text changes and additions to the EIS resulting from the comments received during the review period. Chapter 4, Consultation and Coordination, contains background information, consultation and coordination processes, and copies of comment letters received during the 60-day review period. All comment letters have been reprinted verbatim and responses to individual comments are adjacent to the comment.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jul 01, 1986
Accession Number
ADA274608

Entities

Organizations

  • Bureau of Land Management

Tags

Communities of Interest

  • Biomedical
  • Cyber
  • Energy and Power Technologies

DTIC Thesaurus Topics

  • Air Force
  • Birds
  • Environment
  • Environmental Protection
  • Flood Control
  • Flood Damage
  • Geography
  • Habitats
  • Natural Resources
  • North America
  • Pumping Stations
  • Transportation
  • United States
  • Water Resources
  • Wildlife

Fields of Study

  • Environmental science

Readers

  • Business Analytics
  • Coastal and Marine Engineering/Sediment Transport/Hydraulic Engineering
  • Environmental Impact Assessment (EIA) of Proposed Air Force Base Actions.