Program for Army Spill Sites. Phase 1, Task 24, Version 3.2. Volume 1
Abstract
This final technical plan describes the work that will be undertaken to provide technical services necessary to conduct a typical Phase I program in areas identified as Army spill sites (sections 1 and 2). The overall objective of task 24 is to assess the nature and extent of contamination in the unsaturated zone in areas reported to be Army spill sites and in selected structures where physical inventories will be developed. An exploratory survey providing geotechnical and chemical information will be used to: (1) identify the possible contaminants in the soil at each site; (2) provide the basis for an estimate of the volume of contaminated material present; (3) provide a basis for the design of a phase II program leading to a remedial plan; and (4) provide litigation support and apportion cleanup costs between the Army.
Document Details
- Document Type
- Technical Report
- Publication Date
- Nov 01, 1987
- Accession Number
- ADA274640
Entities
Organizations
- Ebasco Services