Implementation Document for Other Contamination Sources Interim Response Action shell Section 36 Trenches, RMA. Volume 1. General

Abstract

The interim response action for shell section 36 trenches will consist of: 1. Physical barrier surrounding the trenches; 2. Soil and vegetative cover; 3. Abandonment of 15 existing monitoring wells and 10 wells points; and 4. Installation of 7 new monitoring wells. This draft implementation plan contains: 1. Mou between the army and shell concerning shell's participation in the IRA's; 2. Construction work plan; 3. Cost estimates; 4. Task specific health and safety plan; 5. Engineering specifications; and 6. Engineering drawings. Comments and responses are bound separately.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Dec 01, 1990
Accession Number
ADA274656

Tags

Communities of Interest

  • Biomedical

DTIC Thesaurus Topics

  • Alkenes
  • Chemical Compounds
  • Chemical Synthesis
  • Chemistry
  • Construction
  • Contamination
  • Cost Estimates
  • Engineering
  • Engineering Drawings
  • Groundwater
  • Materials Laboratories
  • Materials Science
  • Materials Testing
  • Measurement
  • Medical Personnel
  • Rocky Mountains
  • United States

Readers

  • Business Analytics
  • Environmental Remediation and Restoration.