Rocky Mountain Arsenal Boundary Systems Monitoring.
Abstract
The objectives of task 25 are to: monitor ground water flow and contaminant transport in and around the north and northwest boundary containment systems; define contaminant pathways in these areas; provide chemical and hydrologic data for the operation of the containment systems. The objectives will be achieved by the following means: a detailed geologic study of the denver formation and the alluvial aquifer; long-term monitoring of wells on a quarterly basis to determine the distribution and concentration of contaminants and the configuration of piezometric surfaces; Maps showing contaminant distribution and geologic and hydrologic data will be prepared to support the operations of the boundary systems
Document Details
- Document Type
- Technical Report
- Publication Date
- Jul 09, 1988
- Accession Number
- ADA275587