Offpost Interim Response Action, Alternatives Assessment, Version 2.3
Abstract
The purposes of this off-post interim response action alternatives assessment are to: (1) Set forth the IRA objectives; (2) Summarize the evaluations performed and the estimated costs for alternatives considered; and (3) Present a conceptualization of the preferred alternative. Sections of this report include: (1) Information on the IRA process; (2) Study area description including contaminants of concern; (3) Interim response action objectives; (4) General response actions - alternative water supply, management of contaminant migration, and ground water treatment; (5) Technology inventory of potentially applicable process; and (6) Development of a preferred alternative including costs.
Document Details
- Document Type
- Technical Report
- Publication Date
- Dec 01, 1988
- Accession Number
- ADA275596