Parametric Cost Model for Ground Vehicles
Abstract
A model is being developed to facilitate quick, detailed cost estimates for ground vehicles. This model will contain a logic structure to catalog the particular equipment being costed in broad categories, each of which will have its own parametric relationship. The model will also involve a feedback module that will compare predicted costs with actual costs to test the model accuracy and update the cost estimating relationships when the accuracy of the model falls below a threshold value.
Document Details
- Document Type
- Technical Report
- Publication Date
- Sep 01, 1993
- Accession Number
- ADA275651
Entities
People
- Patrick Nunez
Organizations
- Tank-automotive and Armaments Command