Contractor Logistics Support (CLS) Cost Factors Development

Abstract

This paper presents the process involved in the development of CLS cost factors. These factors are published on a yearly basis in AFR 173-13, US air Force Cost and Planning Factors. They are also used in the Automated Budget Integrated Data Environment System (ABIDES) database at the SAF/FMC level. The ABIDES system is the Air Staff's overall planning tool. The CLS factors developed by the Oklahoma City Air Logistics Center/Financial Management Directorate, Cost Analysis Section (OC-ALC/FMPSC) are used to realign flying hour programs, and/or the number of aircraft supported. They are also used in what-if scenarios to support management decisions.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Sep 01, 1993
Accession Number
ADA275774

Entities

People

  • Thomas M. Prebula

Tags

Communities of Interest

  • Air Platforms

DTIC Thesaurus Topics

  • Air Force
  • Air Force Facilities
  • Aircraft Equipment
  • Aircrafts
  • Airframes
  • Cargo Aircraft
  • Commercial Aircraft
  • Cost Analysis
  • Engineering
  • Financial Management
  • Logistics
  • Logistics Support
  • Transport Aircraft
  • Turbofan Engines
  • Turboprop Engines
  • United States
  • Warfare

Readers

  • Environmental Impact Assessment (EIA) of Proposed Air Force Base Actions.
  • Life Cycle Cost Analysis